Director’s Blog – Analysis & Opinion

Puget Sound Nutrient Problem: Chapter 2

In Which Washington Ecology Issues Illegal Discharge Permits Year After Year

by Nina Bell • February 8, 2020

 

 

This is Chapter 2 in the continuing saga on how the Washington Department of Ecology sits on its hands while Puget Sound dies.  Given Ecology’s recent blog post asserting that it’s actually doing somethingwhich I’ll address in Chapter 5it’s essential to reveal and speak truth to power, as the old saying goes. 

You don’t have to know too much about the federal Clean Water Act to know that it is supposed to give usthe publicclean water.  One of the mechanisms to achieve that end is the requirement that cities and industries that discharge pollution to public waters through a pipe are required to have a discharge permit.  And the most fundamental concept about these permits is that they may not allow a discharge that causes or contributes to a violation of water quality standards. 

Simply put, Ecology is prohibited by law from issuing permits that allow cities to discharge nitrogen pollution to Puget Sound when, as it is now, the nitrogen levels are already causing violations of water quality standards.  These standards set the minimum level of water quality that’s acceptable, whether it’s the level of dissolved oxygen needed to support Dungeness crabs and Chinook salmon, prohibiting human-generated algae floating on the waters’ surface, or limiting the amount of dioxin in order to protect people and orcas.   

Following the law is not one of Ecology’s strong points, to put it mildly.  Because, if you see it from the agency’s viewpoint, following the law means telling cities and industries to install pollution controls.  Pollution controls are expensive and therefore unpopular.  And Ecology doesn’t want the political hassle that comes with being unpopular.  As a result, Ecology has just continued to issue discharge permits without any limits on nitrogen pollution since, well actually, since it started issuing the permits.   

There is literally only one permitout of 107 permits for sewage treatment plants that discharge to Puget Soundthat requires the removal of nitrogen pollution and that’s for the LOTT facility (Lacey, Olympia, Tumwater, and Thurston County) that discharges to Budd Inlet. 

I2016, we began writing comments on Ecology’s draft permits saying that they were illegal because they contained no limits on nitrogen discharges.  Each time, Ecology told us that nitrogen controls were not necessary.  (Now, even though it’s changed its mind, it’s still issuing permits without nitrogen limits.) 

We turned around and filed a 100-page petition with the U.S. EPA asking that the federal government take over the job of issuing discharge permits in Washington State since the state cannot manage to follow the Clean Water Act.  We’re coming up on three years and EPA still hasn’t given us an answer.  I’m sure that you’re shocked, just shocked. 

Stay tuned for Chapter 3, In Which Washington Ecology Refuses to Develop the Required Clean-Up Plan  

 

 

Join with Us

Related News

Should Oil and Gas Drilling Expand in This Biodiverse National Forest? The Public Overwhelmingly Says No. 

April 1, 2025 Author: By Lee Hedgepeth CONECUH NATIONAL FOREST, Ala.—Jimmy Stiles knows Conecuh National Forest. He lives in it.  Stiles, a field biologist, has lived in his home in the northern section of the forest, which lines the Alabama-Florida border, ...
From Louisiana to Pennsylvania, Tracing Plastics Pollution Back to Its Source

From Louisiana to Pennsylvania, Tracing Plastics Pollution Back to Its Source

April 1, 2025 Author: By Kiley Bense While filming a documentary about oceans on a boat in the Pacific Ocean several years ago, producer and director Steve Cowan encountered a shocking scene. “We were surrounded from horizon to horizon by floating plastic,” ...

The bid to make Illinois a leader on electric trucking

April 1, 2025 Author: A coalition of environmental justice advocates is pushing Illinois to become the first Midwest state to adopt California’s Advanced Clean Trucks standards designed to spur a transition to zero-emission heavy-duty vehicles over the next ...
No results found.
Share This